Contract Unit
|
25 metric tons |
Price Quotation
|
U.S. dollars and cents per metric ton |
Trading Hours
|
Sunday - Friday 6:00 p.m. - 5:00 p.m. (5:00 p.m. - 4:00 p.m. Chicago Time/CT) with a 60-minute break each day beginning at 5:00 p.m. (4:00 p.m. CT) |
Minimum Price Fluctuation
|
0.01 per metric ton = $0.25
|
Product Code
|
CME Globex: AEPCME ClearPort: AEPClearing: AEP
|
Listed Contracts
|
Monthly contracts listed for the current year and the next 2 calendar years. Monthly contracts for a new calendar year will be added following the termination of trading in the December contract of the current year.
|
Settlement Method
|
Financially Settled |
Floating Price
|
The Floating Price for each contract month shall be equal to the arithmetic average calculated to two decimal places of each daily mid-point of the Metal Bulletin Aluminium P1020A, in-whs dup Rotterdam, $/tonne for each day during the contract month published by Fastmarkets MB. |
Termination Of Trading
|
Trading terminates on the last business day of the contract month
|
Position Limits
|
COMEX Position Limits |
Exchange Rulebook
|
COMEX 108 |
Block Minimum
|
Block Minimum Thresholds |
Vendor Codes
|
Quote Vendor Symbols Listing |