DATE: June 11, 2015
MKR#: 06-11-15B
SUBJECT: REGULARITY APPROVAL FOR ZINC
In connection with the listing of the physically delivered Zinc futures contract on trade date June 29, 2015, the Commodity Exchange, Inc. (“COMEX” or “Exchange”) approved the application of Dearborn Distribution Services for regularity in zinc at their location in Dearborn, MI. The approved capacity of this facility is 28,500 metric tons.
The rates that have been approved by the Exchange to be published on behalf of Dearborn Distribution Services are as follows:
Outbound handling FOT (truck) per metric ton |
$42.00 |
Outbound handling FOR (rail) per metric ton |
$49.50 |
Inside Storage per metric ton (rent per calendar month without proration) |
$15.00 |
Rail switch (per car in or out) |
$150.00 |
Blocking/bracing in rail car (per car outbound) |
$450.00 |
Dunnage disposal (per car inbound) |
$100.00 |
Labor rate (per hour or fraction, thereof) |
$78.00 |
Weighing/lotting |
$9.00 |
Warrant processing (original) |
$25.00 |
Replacement receipt or warrant (per document) |
$25.00 |
In-bond bill-of-lading change (per document) |
$25.00 |
Blocking/bracing on truck)* |
N/A |
Rail car order processing (per car order) |
$25.00 |
Rail car trace processing (per car) |
$25.00 |
Min. Storage charge (<1 lot per month or fraction) |
$100.00 |
*Materials available for purchase locally; driver responsible for installing blocking/bracing for liability reasons. |
Please refer questions on this subject to:
Market Surveillance:
Terry Gehring Terry.Gehring@cmegroup.com (312) 435-3644