• Consolidate Power Slate: Phase 1B-Amend Products

      • To
      • Clearing Member Firms; Back Office Managers
      • From
      • CME Clearing
      • #
      • 13-368
      • Notice Date
      • 14 August 2013
      • Effective Date
      • 26 August 2013
    • On Monday August 26th, 2013 the size and names for the Power Contracts listed below will be modified.  All other product specifications and attributes including trading minimum tick will remain unchanged. J01-J31 is only a name change.
       
      The following products will be updated:
       
       

      Product
      Clearing Code
      New Name
      Existing Size
      New Size
      PJM Western Hub Real-Time Peak Calendar-Day 2.5 MW Futures
      JD
      PJM Western Hub Real-Time Peak Calendar-Day 5 MW Futures
      2.5 MW
      5 MW
      PJM Northern Illinois Hub Real-Time Peak Calendar-Day 2.5 MW Futures
      UD
      PJM Northern Illinois Hub Real-Time Peak Calendar-Day 5 MW Futures
      2.5 MW
      5 MW
      PJM AEP Dayton Hub Real-Time Peak Calendar-Day 2.5 MW Futures
      VD
      PJM AEP Dayton Hub Real-Time Peak Calendar-Day 5 MW Futures
      2.5 MW
      5 MW
      PJM West Hub Same Day Option
      J01-J31
      PJM West Hub 50 MW Same Day Option
      50 MW
      50 MW
      NYISO Zone G Day-Ahead Peak Calendar-Day 2.5 MW Futures
      GN
      NYISO Zone G Day-Ahead Peak Calendar-Day 5 MW Futures
      2.5 MW
      5 MW