Start Period | End Period | ||||||||
---|---|---|---|---|---|---|---|---|---|
NYM | ELECTRICITY | MID-COLMBA DAY-AHEAD OFF-PEAK DAILY | MXO | 06/15/2022 | 07/31/2022 | 20 USD | 0.08 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB MW PEAK FUT | N1 | 07/2022 | 07/2022 | 2,250 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB MW PEAK FUT | N1 | 08/2022 | 08/2022 | 1,800 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB MW PEAK FUT | N1 | 09/2022 | 12/2027 | 1,350 USD | 0.05 | ||
NYM | ELECTRICITY | PJM NILL DA PEAK | N3 | 07/2022 | 07/2022 | 525 USD | 0.025 | ||
NYM | ELECTRICITY | PJM NILL DA PEAK | N3 | 08/2022 | 08/2022 | 465 USD | 0.025 | ||
NYM | ELECTRICITY | PJM NILL DA PEAK | N3 | 09/2022 | 10/2022 | 410 USD | 0.025 | ||
NYM | ELECTRICITY | PJM NILL DA PEAK | N3 | 11/2022 | 05/2023 | 190 USD | 0.025 | ||
NYM | ELECTRICITY | PJM NILL DA PEAK | N3 | 06/2023 | 06/2028 | 140 USD | 0.025 | ||
NYM | ELECTRICITY | NYISO ZONE C 5 MW PEAK CAL DAY FUT | N3P | 06/15/2022 | 06/27/2022 | 3,000 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE C 5 MW PEAK CAL DAY FUT | N3P | 06/28/2022 | 07/07/2022 | 2,000 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE C 5 MW PEAK CAL DAY FUT | N3P | 07/08/2022 | 07/29/2022 | 1,190 USD | 0.05 | ||
NYM | ELECTRICITY | PJM WESTH RT OFF-PEAK | N9 | 07/2022 | 07/2022 | 115 USD | 0.025 | ||
NYM | ELECTRICITY | PJM WESTH RT OFF-PEAK | N9 | 08/2022 | 08/2022 | 95 USD | 0.025 | ||
NYM | ELECTRICITY | PJM WESTH RT OFF-PEAK | N9 | 09/2022 | 10/2022 | 90 USD | 0.025 | ||
NYM | ELECTRICITY | PJM WESTH RT OFF-PEAK | N9 | 11/2022 | 05/2023 | 70 USD | 0.025 | ||
NYM | ELECTRICITY | PJM WESTH RT OFF-PEAK | N9 | 06/2023 | 12/2027 | 15 USD | 0.025 | ||
NYM | ELECTRICITY | NYISO ZONE C OFFPEAK CAL DAY AHEAD | NCD | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE C OFFPEAK CAL DAY AHEAD | NCD | 07/02/2022 | 07/07/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE C OFFPEAK CAL DAY AHEAD | NCD | 07/08/2022 | 07/31/2022 | 55 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENG MASS HUB DA OP DAILY | NCO | 06/14/2022 | 07/07/2022 | 160 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG MASS HUB DA OP DAILY | NCO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG NE MASSACHUSETTS OP FUT | NEO | 06/14/2022 | 07/07/2022 | 150 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG NE MASSACHUSETTS OP FUT | NEO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | NYISO ZONE E 5 MW PEAK CALENDAR-DAY | NEP | 06/15/2022 | 06/27/2022 | 3,000 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE E 5 MW PEAK CALENDAR-DAY | NEP | 06/28/2022 | 07/07/2022 | 2,000 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE E 5 MW PEAK CALENDAR-DAY | NEP | 07/08/2022 | 07/29/2022 | 1,150 USD | 0.05 | ||
NYM | ELECTRICITY | ISO NE CAL FUT STRP SYNTH | NES | 01/2023 | 01/2023 | 141,300 USD | 0.25 | ||
NYM | ELECTRICITY | ISO NE CAL FUT STRP SYNTH | NES | 01/2024 | 01/2024 | 134,400 USD | 0.25 | ||
NYM | ELECTRICITY | ISO NE CAL FUT STRP SYNTH | NES | 01/2025 | 01/2025 | 133,875 USD | 0.25 | ||
NYM | ELECTRICITY | NYISO ZONE F 5 MW PEAK CALENDAR-DAY | NFD | 06/15/2022 | 06/27/2022 | 3,000 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE F 5 MW PEAK CALENDAR-DAY | NFD | 06/28/2022 | 07/07/2022 | 2,000 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE F 5 MW PEAK CALENDAR-DAY | NFD | 07/08/2022 | 07/29/2022 | 1,350 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE F 5 MW OFF-PEAK CAL FUT | NFO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE F 5 MW OFF-PEAK CAL FUT | NFO | 07/02/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENG NEW HAMPSHIRE ZONE OP | NHO | 06/14/2022 | 07/07/2022 | 150 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG NEW HAMPSHIRE ZONE OP | NHO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENGLND NHAMP ZN PK DA FUT | NHP | 06/14/2022 | 07/07/2022 | 4,000 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLND NHAMP ZN PK DA FUT | NHP | 07/08/2022 | 07/29/2022 | 3,500 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENG MAINE ZONE OP 5MW FUT | NMO | 06/14/2022 | 07/07/2022 | 150 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG MAINE ZONE OP 5MW FUT | NMO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENGLND MAINE ZN PEAK FUT | NMP | 06/14/2022 | 07/07/2022 | 3,650 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLND MAINE ZN PEAK FUT | NMP | 07/08/2022 | 07/29/2022 | 3,000 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO NYC IN-CITY CAPACITY CAL MO | NNC | 07/2022 | 12/2025 | 4,000 USD | 0.08 | ||
NYM | ELECTRICITY | ISO NEW ENGLND NE MASS ZN PK FUT | NNP | 06/14/2022 | 07/07/2022 | 3,800 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLND NE MASS ZN PK FUT | NNP | 07/08/2022 | 07/29/2022 | 3,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NORTERN ILL HUB RT OP DAILY | NOC | 06/13/2022 | 06/30/2022 | 350 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NORTERN ILL HUB RT OP DAILY | NOC | 07/01/2022 | 07/06/2022 | 200 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NORTERN ILL HUB RT OP DAILY | NOC | 07/07/2022 | 07/31/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE E 5 MW OFFPEAK CAL DAY | NOD | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE E 5 MW OFFPEAK CAL DAY | NOD | 07/02/2022 | 07/07/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE E 5 MW OFFPEAK CAL DAY | NOD | 07/08/2022 | 07/31/2022 | 60 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENG RHDE ISLND ZNE OFFPEAK | NRO | 06/14/2022 | 07/07/2022 | 150 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG RHDE ISLND ZNE OFFPEAK | NRO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENGLND RHOD ISLND ZN PK FUT | NRP | 06/14/2022 | 07/07/2022 | 2,850 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLND RHOD ISLND ZN PK FUT | NRP | 07/08/2022 | 07/29/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO REST OF STATE CAPACITY CAL MO | NRS | 07/2022 | 07/2022 | 3,500 USD | 0.08 | ||
NYM | ELECTRICITY | NYISO REST OF STATE CAPACITY CAL MO | NRS | 08/2022 | 08/2022 | 2,500 USD | 0.08 | ||
NYM | ELECTRICITY | NYISO REST OF STATE CAPACITY CAL MO | NRS | 09/2022 | 12/2022 | 2,000 USD | 0.08 | ||
NYM | ELECTRICITY | NYISO REST OF STATE CAPACITY CAL MO | NRS | 01/2023 | 12/2025 | 1,500 USD | 0.08 | ||
NYM | ELECTRICITY | ISO NEW ENG SE MASS ZONE OP 5MW DA | NSO | 06/14/2022 | 07/07/2022 | 150 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG SE MASS ZONE OP 5MW DA | NSO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENGLND SE MASS ZN PK FUT | NSP | 06/14/2022 | 07/07/2022 | 2,600 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLND SE MASS ZN PK FUT | NSP | 07/08/2022 | 07/29/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLAND CONN ZN PEAK DA FUT | NTP | 06/14/2022 | 07/07/2022 | 2,850 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLAND CONN ZN PEAK DA FUT | NTP | 07/08/2022 | 07/29/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENG WC MASS ZONE OP FUT | NWO | 06/14/2022 | 07/07/2022 | 150 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENG WC MASS ZONE OP FUT | NWO | 07/08/2022 | 07/31/2022 | 120 USD | 50.000% | ||
NYM | ELECTRICITY | ISO NEW ENGLND WC MASS ZN PK FUT | NWP | 06/14/2022 | 07/07/2022 | 3,000 USD | 0.2 | ||
NYM | ELECTRICITY | ISO NEW ENGLND WC MASS ZN PK FUT | NWP | 07/08/2022 | 07/29/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB 5 MW OFFPK S | O1 | 07/2022 | 07/2022 | 65 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB 5 MW OFFPK S | O1 | 08/2022 | 12/2027 | 45 USD | 0.05 | ||
NYM | ELECTRICITY | ONTARIO OFF-PK CALENDAR DAY FUTURES | OFD | 06/13/2022 | 07/06/2022 | 80 CAD | 50.000% | ||
NYM | ELECTRICITY | ONTARIO OFF-PK CALENDAR DAY FUTURES | OFD | 07/07/2022 | 07/31/2022 | 70 CAD | 50.000% | ||
NYM | ELECTRICITY | ONTARIO OFF-PK CAL-MO FUTURES | OFM | 07/2022 | 07/2022 | 20 CAD | 0.1 | ||
NYM | ELECTRICITY | ONTARIO OFF-PK CAL-MO FUTURES | OFM | 08/2022 | 08/2022 | 15 CAD | 0.1 | ||
NYM | ELECTRICITY | ONTARIO OFF-PK CAL-MO FUTURES | OFM | 09/2022 | 12/2026 | 10 CAD | 0.1 | ||
NYM | ELECTRICITY | ILLINOIS OFF-PEAK MONTH FUT | OJ | 06/2022 | 06/2022 | 17 USD | 0.05 | ||
NYM | ELECTRICITY | ILLINOIS OFF-PEAK MONTH FUT | OJ | 07/2022 | 11/2022 | 20 USD | 0.05 | ||
NYM | ELECTRICITY | ILLINOIS OFF-PEAK MONTH FUT | OJ | 12/2022 | 12/2025 | 12 USD | 0.05 | ||
NYM | ELECTRICITY | ILLINOIS HUB PEAK MONTH FUT | OM | 06/2022 | 06/2022 | 340 USD | 0.05 | ||
NYM | ELECTRICITY | ILLINOIS HUB PEAK MONTH FUT | OM | 07/2022 | 11/2022 | 400 USD | 0.05 | ||
NYM | ELECTRICITY | ILLINOIS HUB PEAK MONTH FUT | OM | 12/2022 | 12/2027 | 200 USD | 0.05 | ||
NYM | ELECTRICITY | MID-COLUMBIA DAY AHEAD OFF PEAK FIX | OMC | 07/2022 | 07/2022 | 30 USD | 0.08 | ||
NYM | ELECTRICITY | MID-COLUMBIA DAY AHEAD OFF PEAK FIX | OMC | 08/2022 | 10/2022 | 20 USD | 0.08 | ||
NYM | ELECTRICITY | MID-COLUMBIA DAY AHEAD OFF PEAK FIX | OMC | 11/2022 | 12/2027 | 15 USD | 0.08 | ||
NYM | ELECTRICITY | PJM WESTERN HUB RT OF-PK STRP 50 MW | OO6 | 01/2023 | 01/2023 | 1,764,800 USD | 25.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB RT OF-PK STRP 50 MW | OO6 | 01/2024 | 01/2024 | 703,200 USD | 25.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB RT OF-PK STRP 50 MW | OO6 | 01/2025 | 01/2025 | 702,000 USD | 25.000% | ||
NYM | ELECTRICITY | ONTARIO PEAK CAL-DAY FUTURES | OPD | 06/13/2022 | 06/30/2022 | 3,500 CAD | 0.2 | ||
NYM | ELECTRICITY | ONTARIO PEAK CAL-DAY FUTURES | OPD | 07/01/2022 | 07/29/2022 | 1,450 CAD | 0.2 | ||
NYM | ELECTRICITY | ONTARIO PEAK CAL-MONTH FUTURES | OPM | 07/2022 | 07/2022 | 450 CAD | 0.1 | ||
NYM | ELECTRICITY | ONTARIO PEAK CAL-MONTH FUTURES | OPM | 08/2022 | 08/2022 | 280 CAD | 0.1 | ||
NYM | ELECTRICITY | ONTARIO PEAK CAL-MONTH FUTURES | OPM | 09/2022 | 05/2023 | 250 CAD | 0.1 | ||
NYM | ELECTRICITY | ONTARIO PEAK CAL-MONTH FUTURES | OPM | 06/2023 | 12/2026 | 200 CAD | 0.1 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD OFF PEAK FIX | OVD | 07/2022 | 07/2022 | 30 USD | 0.08 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD OFF PEAK FIX | OVD | 08/2022 | 10/2022 | 20 USD | 0.08 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD OFF PEAK FIX | OVD | 11/2022 | 12/2027 | 15 USD | 0.08 | ||
NYM | ELECTRICITY | NEPOOL CONECTIC 5MW D AH PK | P2 | 06/2022 | 06/2022 | 400 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL CONECTIC 5MW D AH PK | P2 | 07/2022 | 07/2022 | 1,200 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL CONECTIC 5MW D AH PK | P2 | 08/2022 | 10/2022 | 850 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL CONECTIC 5MW D AH PK | P2 | 11/2022 | 12/2027 | 250 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL CNCTCT 5MW D AH O PK | P3 | 06/2022 | 12/2027 | 20 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL CNCTCT 5MW D AH O PK | P3 | 07/2022 | 07/2022 | 45 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL CNCTCT 5MW D AH O PK | P3 | 08/2022 | 09/2022 | 35 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH PK | P4 | 06/2022 | 06/2022 | 400 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH PK | P4 | 07/2022 | 07/2022 | 1,200 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH PK | P4 | 08/2022 | 09/2022 | 500 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH PK | P4 | 10/2022 | 12/2027 | 200 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH O PK | P5 | 06/2022 | 06/2022 | 16 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH O PK | P5 | 07/2022 | 07/2022 | 40 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH O PK | P5 | 08/2022 | 09/2022 | 30 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL SE MASS 5MW D AH O PK | P5 | 10/2022 | 12/2027 | 25 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH PK | P7 | 06/2022 | 06/2022 | 250 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH PK | P7 | 07/2022 | 07/2022 | 750 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH PK | P7 | 08/2022 | 10/2022 | 450 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH PK | P7 | 11/2022 | 04/2023 | 220 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH PK | P7 | 05/2023 | 12/2027 | 150 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH O PK | P8 | 06/2022 | 06/2022 | 15 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH O PK | P8 | 07/2022 | 07/2022 | 30 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH O PK | P8 | 08/2022 | 09/2022 | 25 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH O PK | P8 | 10/2022 | 04/2023 | 13 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NE MASS 5MW D AH O PK | P8 | 05/2023 | 12/2027 | 10 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH PK | P9 | 06/2022 | 06/2022 | 366 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH PK | P9 | 07/2022 | 07/2022 | 1,000 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH PK | P9 | 08/2022 | 09/2022 | 700 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH PK | P9 | 10/2022 | 12/2027 | 225 USD | 0.025 | ||
NYM | ELECTRICITY | PJM AEP DAYTON HUB DA PEAK DAILY | PAP | 06/14/2022 | 07/01/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM AEP DAYTON HUB DA PEAK DAILY | PAP | 07/05/2022 | 07/29/2022 | 1,200 USD | 0.2 | ||
NYM | ELECTRICITY | PJM AEP 50 MW CAL STRIP SYNTH | PAS | 01/2023 | 01/2023 | 1,822,000 USD | 0.25 | ||
NYM | ELECTRICITY | PJM BGE ZONE OFF-PEAK CAL D | PBO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM BGE ZONE OFF-PEAK CAL D | PBO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM BGE ZONE OFF-PEAK CAL D | PBO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM BGE ZONE PEAK CAL DAY FUT | PBP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM BGE ZONE PEAK CAL DAY FUT | PBP | 07/05/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM COMED ZONE OFF-PK DAY AHEAD FUT | PCO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM COMED ZONE OFF-PK DAY AHEAD FUT | PCO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM COMED ZONE OFF-PK DAY AHEAD FUT | PCO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM COMED ZONE PEAK CALDAY DA FUT | PCP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM COMED ZONE PEAK CALDAY DA FUT | PCP | 07/05/2022 | 07/07/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM COMED ZONE PEAK CALDAY DA FUT | PCP | 07/08/2022 | 07/29/2022 | 1,600 USD | 0.2 | ||
NYM | ELECTRICITY | MISO INDIANA HUB 5MW PK CAL DAYHD | PDD | 06/13/2022 | 06/30/2022 | 2,400 USD | 50.000% | ||
NYM | ELECTRICITY | MISO INDIANA HUB 5MW PK CAL DAYHD | PDD | 07/01/2022 | 07/29/2022 | 1,300 USD | 50.000% | ||
NYM | ELECTRICITY | PJM DAILY LOAD FORECAST FUT | PDJ | 06/16/2022 | 07/05/2022 | 450 USD | 0.08 | ||
NYM | ELECTRICITY | PJM AEP DAYTON HUB DA OP DAILY | PEO | 06/14/2022 | 07/01/2022 | 160 USD | 50.000% | ||
NYM | ELECTRICITY | PJM AEP DAYTON HUB DA OP DAILY | PEO | 07/02/2022 | 07/31/2022 | 50 USD | 50.000% | ||
NYM | ELECTRICITY | PJM AECO ZONE OFF-PEAK CAL DA FUT | PFO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM AECO ZONE OFF-PEAK CAL DA FUT | PFO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM AECO ZONE OFF-PEAK CAL DA FUT | PFO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE OFF-PEAK CAL DAY AHEA | PHO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE OFF-PEAK CAL DAY AHEA | PHO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE OFF-PEAK CAL DAY AHEA | PHO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE PEAK CALDAY DA FUT | PHP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE PEAK CALDAY DA FUT | PHP | 07/05/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PENELEC ZONE PEAK CALDAY DA FUT | PKP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PENELEC ZONE PEAK CALDAY DA FUT | PKP | 07/05/2022 | 07/07/2022 | 2,300 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PENELEC ZONE PEAK CALDAY DA FUT | PKP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PPL ZONE OFF-PEAK CALDAY FUT | PLO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PPL ZONE OFF-PEAK CALDAY FUT | PLO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PPL ZONE OFF-PEAK CALDAY FUT | PLO | 07/08/2022 | 07/31/2022 | 80 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PPL ZONE PEAK CALDAY DA FUT | PLP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PPL ZONE PEAK CALDAY DA FUT | PLP | 07/05/2022 | 07/07/2022 | 2,370 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PPL ZONE PEAK CALDAY DA FUT | PLP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM METED ZONE OFF-PEAK CALDAY FUT | PMO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM METED ZONE OFF-PEAK CALDAY FUT | PMO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM METED ZONE OFF-PEAK CALDAY FUT | PMO | 07/08/2022 | 07/31/2022 | 80 USD | 0.2 | ||
NYM | ELECTRICITY | PJM METED ZONE PEAK CALDAY DA PHY | PMP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM METED ZONE PEAK CALDAY DA PHY | PMP | 07/05/2022 | 07/07/2022 | 2,330 USD | 0.2 | ||
NYM | ELECTRICITY | PJM METED ZONE PEAK CALDAY DA PHY | PMP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NORTERN ILL HUB DA OP DAILY | PNO | 06/14/2022 | 07/31/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NORTERN ILL HUB DA PEAK DAILY | PNP | 06/14/2022 | 06/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NORTERN ILL HUB DA PEAK DAILY | PNP | 06/30/2022 | 07/29/2022 | 1,300 USD | 0.2 | ||
NYM | ELECTRICITY | PJM NI HUB 50 LMP CAL STRIP SYNTH | PNS | 01/2023 | 01/2023 | 383,200 USD | 25.000% | ||
NYM | ELECTRICITY | PJM NI HUB 50 LMP CAL STRIP SYNTH | PNS | 01/2024 | 01/2026 | 332,800 USD | 25.000% | ||
NYM | ELECTRICITY | PJM NI HUB 50 LMP CAL STRIP SYNTH | PNS | 01/2025 | 01/2025 | 331,500 USD | 25.000% | ||
NYM | ELECTRICITY | PJM NI HUB 50 LMP CAL STRIP SYNTH | PNS | 01/2027 | 01/2027 | 334,100 USD | 25.000% | ||
NYM | ELECTRICITY | PJM PENELEC ZONE OFF-PEAK CALDAY FU | POC | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PENELEC ZONE OFF-PEAK CALDAY FU | POC | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PENELEC ZONE OFF-PEAK CALDAY FU | POC | 07/08/2022 | 07/31/2022 | 70 USD | 0.2 | ||
NYM | ELECTRICITY | PJM JCPL PEAK CALDAY DAY AHEAD FUT | PPL | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM JCPL PEAK CALDAY DAY AHEAD FUT | PPL | 07/05/2022 | 07/07/2022 | 2,370 USD | 0.2 | ||
NYM | ELECTRICITY | PJM JCPL PEAK CALDAY DAY AHEAD FUT | PPL | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DUQUESNE ZONE OFF-PEAK CALDAY F | PQO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DUQUESNE ZONE OFF-PEAK CALDAY F | PQO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DUQUESNE ZONE OFF-PEAK CALDAY F | PQO | 07/08/2022 | 07/31/2022 | 70 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DUQUESNE ZONE OFF PEAK CALDAY F | PQP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DUQUESNE ZONE OFF PEAK CALDAY F | PQP | 07/05/2022 | 07/07/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DUQUESNE ZONE OFF PEAK CALDAY F | PQP | 07/08/2022 | 07/29/2022 | 1,810 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE OFF PEAK CALDAY RT FU | PRO | 06/13/2022 | 06/30/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE OFF PEAK CALDAY RT FU | PRO | 07/01/2022 | 07/06/2022 | 125 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE OFF PEAK CALDAY RT FU | PRO | 07/07/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM ATSI ZONE PEAK CALDAY RT FUT | PRP | 06/13/2022 | 06/24/2022 | 4,000 USD | 0.05 | ||
NYM | ELECTRICITY | PJM ATSI ZONE PEAK CALDAY RT FUT | PRP | 06/27/2022 | 07/06/2022 | 2,500 USD | 0.05 | ||
NYM | ELECTRICITY | PJM ATSI ZONE PEAK CALDAY RT FUT | PRP | 07/07/2022 | 07/29/2022 | 2,000 USD | 0.05 | ||
NYM | ELECTRICITY | PJM PSEG ZONE OFF-PEAK CAL D | PSO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PSEG ZONE OFF-PEAK CAL D | PSO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PSEG ZONE OFF-PEAK CAL D | PSO | 07/08/2022 | 07/31/2022 | 80 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PSEG ZONE PEAK CALDAY DA FUT | PSP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PSEG ZONE PEAK CALDAY DA FUT | PSP | 07/05/2022 | 07/07/2022 | 2,420 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PSEG ZONE PEAK CALDAY DA FUT | PSP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | MISO INDIANA HUB 5MW PK CAL-DAY RT | PTD | 06/13/2022 | 06/29/2022 | 3,300 USD | 50.000% | ||
NYM | ELECTRICITY | MISO INDIANA HUB 5MW PK CAL-DAY RT | PTD | 06/30/2022 | 07/05/2022 | 1,500 USD | 50.000% | ||
NYM | ELECTRICITY | MISO INDIANA HUB 5MW PK CAL-DAY RT | PTD | 07/06/2022 | 07/29/2022 | 1,250 USD | 50.000% | ||
NYM | ELECTRICITY | PJM JCPL ZONE OFF-PEAK CALDAY FUT | PTO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM JCPL ZONE OFF-PEAK CALDAY FUT | PTO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM JCPL ZONE OFF-PEAK CALDAY FUT | PTO | 07/08/2022 | 07/31/2022 | 80 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DPL ZONE OFF-PEAK CALDAY FUT | PUO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DPL ZONE OFF-PEAK CALDAY FUT | PUO | 07/02/2022 | 07/07/2022 | 130 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DPL ZONE OFF-PEAK CALDAY FUT | PUO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DPL ZONE OFF PEAK CALDAY DA FUT | PUP | 06/14/2022 | 07/01/2022 | 3,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DPL ZONE OFF PEAK CALDAY DA FUT | PUP | 07/05/2022 | 07/07/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM DPL ZONE OFF PEAK CALDAY DA FUT | PUP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD PEAK FIX PRICE | PVD | 07/2022 | 07/2022 | 500 USD | 0.08 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD PEAK FIX PRICE | PVD | 08/2022 | 11/2022 | 300 USD | 0.08 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD PEAK FIX PRICE | PVD | 12/2022 | 12/2027 | 175 USD | 0.08 | ||
NYM | ELECTRICITY | PJM PECO ZONE OFF-PEAK CALDAY FUT | PVO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PECO ZONE OFF-PEAK CALDAY FUT | PVO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PECO ZONE OFF-PEAK CALDAY FUT | PVO | 07/08/2022 | 07/31/2022 | 80 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PECO ZONE PEAK CALDAY DA FUT | PVP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PECO ZONE PEAK CALDAY DA FUT | PVP | 07/05/2022 | 07/07/2022 | 2,450 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PECO ZONE PEAK CALDAY DA FUT | PVP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM WESTERN HUB DA OP DAILY FUT | PWO | 06/14/2022 | 07/01/2022 | 180 USD | 0.2 | ||
NYM | ELECTRICITY | PJM WESTERN HUB DA OP DAILY FUT | PWO | 07/02/2022 | 07/31/2022 | 60 USD | 0.2 | ||
NYM | ELECTRICITY | PJM WESTERN HUB DA PEAK DAILY | PWP | 06/14/2022 | 07/01/2022 | 2,400 USD | 0.2 | ||
NYM | ELECTRICITY | PJM WESTERN HUB DA PEAK DAILY | PWP | 07/05/2022 | 07/29/2022 | 1,900 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO ZONE OFF-PEAK CALDAY FUT | PXO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO ZONE OFF-PEAK CALDAY FUT | PXO | 07/02/2022 | 07/07/2022 | 110 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO ZONE OFF-PEAK CALDAY FUT | PXO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO ZONE PEAK CALDAY DA FUT | PXP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO ZONE PEAK CALDAY DA FUT | PXP | 07/05/2022 | 07/07/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO ZONE PEAK CALDAY DA FUT | PXP | 07/08/2022 | 07/29/2022 | 1,950 USD | 0.2 | ||
NYM | ELECTRICITY | PJM EASTERN HUB OFF-PEAK CALDAY FUT | PYO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM EASTERN HUB OFF-PEAK CALDAY FUT | PYO | 07/02/2022 | 07/07/2022 | 120 USD | 0.2 | ||
NYM | ELECTRICITY | PJM EASTERN HUB OFF-PEAK CALDAY FUT | PYO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM EASTERN HUB PEAK CALDAY DA FUT | PYP | 06/14/2022 | 07/01/2022 | 3,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM EASTERN HUB PEAK CALDAY DA FUT | PYP | 07/05/2022 | 07/07/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM EASTERN HUB PEAK CALDAY DA FUT | PYP | 07/08/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | PJM APS ZONE OFF-PEAK CAL DAY AHEAD | PZO | 06/14/2022 | 07/01/2022 | 150 USD | 0.2 | ||
NYM | ELECTRICITY | PJM APS ZONE OFF-PEAK CAL DAY AHEAD | PZO | 07/02/2022 | 07/07/2022 | 100 USD | 0.2 | ||
NYM | ELECTRICITY | PJM APS ZONE OFF-PEAK CAL DAY AHEAD | PZO | 07/08/2022 | 07/31/2022 | 75 USD | 0.2 | ||
NYM | ELECTRICITY | PJM APS ZONE PEAK CALDAY DA FUT | PZP | 06/14/2022 | 07/01/2022 | 2,500 USD | 0.2 | ||
NYM | ELECTRICITY | PJM APS ZONE PEAK CALDAY DA FUT | PZP | 07/05/2022 | 07/29/2022 | 2,000 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE C 5MW D AH PK | Q5 | 06/2022 | 06/2022 | 300 USD | 0.025 | ||
NYM | ELECTRICITY | NYISO ZONE C 5MW D AH PK | Q5 | 07/2022 | 12/2027 | 450 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PEPCO DA OFF-PEAK | Q8 | 06/2022 | 06/2022 | 6 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PEPCO DA OFF-PEAK | Q8 | 07/2022 | 07/2022 | 10 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PEPCO DA OFF-PEAK | Q8 | 08/2022 | 05/2028 | 7 USD | 0.025 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD OFF PEAK DAILY | QVD | 06/16/2022 | 07/31/2022 | 30 USD | 0.08 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB 5 PEAK CLND D | R1 | 06/13/2022 | 06/28/2022 | 15,500 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB 5 PEAK CLND D | R1 | 06/29/2022 | 07/06/2022 | 9,000 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB 5 PEAK CLND D | R1 | 07/07/2022 | 07/29/2022 | 7,500 USD | 0.05 | ||
NYM | ELECTRICITY | PJM BGE DA OFF-PEAK | R3 | 06/2022 | 06/2022 | 21 USD | 0.05 | ||
NYM | ELECTRICITY | PJM BGE DA OFF-PEAK | R3 | 07/2022 | 07/2022 | 38 USD | 0.05 | ||
NYM | ELECTRICITY | PJM BGE DA OFF-PEAK | R3 | 08/2022 | 05/2028 | 15 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB OFFPK CLN D | R4 | 06/13/2022 | 06/30/2022 | 675 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB OFFPK CLN D | R4 | 07/01/2022 | 07/06/2022 | 360 USD | 0.05 | ||
NYM | ELECTRICITY | ERCOT WEST 345 KV HUB OFFPK CLN D | R4 | 07/07/2022 | 07/31/2022 | 300 USD | 0.05 | ||
NYM | ELECTRICITY | NEPOOL W CNTR M 5MW D AH PK | R6 | 06/2022 | 06/2022 | 400 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL W CNTR M 5MW D AH PK | R6 | 07/2022 | 07/2022 | 1,100 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL W CNTR M 5MW D AH PK | R6 | 08/2022 | 10/2022 | 700 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL W CNTR M 5MW D AH PK | R6 | 11/2022 | 12/2027 | 250 USD | 0.025 | ||
NYM | ELECTRICITY | PJM DAYTON DA OFF-PEAK | R7 | 07/2022 | 07/2022 | 101 USD | 0.025 | ||
NYM | ELECTRICITY | PJM DAYTON DA OFF-PEAK | R7 | 08/2022 | 08/2022 | 96 USD | 0.025 | ||
NYM | ELECTRICITY | PJM DAYTON DA OFF-PEAK | R7 | 09/2022 | 10/2022 | 91 USD | 0.025 | ||
NYM | ELECTRICITY | PJM DAYTON DA OFF-PEAK | R7 | 11/2022 | 05/2023 | 71 USD | 0.025 | ||
NYM | ELECTRICITY | PJM DAYTON DA OFF-PEAK | R7 | 06/2023 | 06/2028 | 15 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PEPCO DA PEAK | R8 | 06/2022 | 06/2022 | 200 USD | 0.2 | ||
NYM | ELECTRICITY | PJM PEPCO DA PEAK | R8 | 07/2022 | 07/2022 | 400 USD | 0.12 | ||
NYM | ELECTRICITY | PJM PEPCO DA PEAK | R8 | 08/2022 | 05/2028 | 200 USD | 0.05 | ||
NYM | ELECTRICITY | PJM APS ZONE DA PEAK | S4 | 06/2022 | 05/2028 | 200 USD | 0.05 | ||
NYM | ELECTRICITY | PJM APS ZONE DA PEAK | S4 | 07/2022 | 07/2022 | 400 USD | 0.05 | ||
NYM | ELECTRICITY | PJM WESTERN HUB DAY AHD PEAK FUT | SDD | 06/2022 | 06/2022 | 9,200 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB DAY AHD PEAK FUT | SDD | 07/2022 | 07/2022 | 4,025 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB DAY AHD PEAK FUT | SDD | 08/2022 | 10/2022 | 2,300 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB DAY AHD PEAK FUT | SDD | 11/2022 | 04/2023 | 2,070 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB DAY AHD PEAK FUT | SDD | 05/2023 | 12/2027 | 2,070 USD | 10.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB PEAK AVG FUT | SRT | 06/2022 | 06/2022 | 9,200 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB PEAK AVG FUT | SRT | 07/2022 | 07/2022 | 4,025 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB PEAK AVG FUT | SRT | 08/2022 | 10/2022 | 2,300 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB PEAK AVG FUT | SRT | 11/2022 | 04/2023 | 2,070 USD | 20.000% | ||
NYM | ELECTRICITY | PJM WESTERN HUB PEAK AVG FUT | SRT | 05/2023 | 12/2027 | 2,070 USD | 10.000% | ||
NYM | ELECTRICITY | NYISO ZONE G 5MW D AH PK | T3 | 07/2022 | 07/2022 | 1,900 USD | 38.000% | ||
NYM | ELECTRICITY | NYISO ZONE G 5MW D AH PK | T3 | 08/2022 | 08/2022 | 1,850 USD | 38.000% | ||
NYM | ELECTRICITY | NYISO ZONE G 5MW D AH PK | T3 | 09/2022 | 10/2022 | 1,800 USD | 30.000% | ||
NYM | ELECTRICITY | NYISO ZONE G 5MW D AH PK | T3 | 11/2022 | 05/2023 | 1,200 USD | 18.000% | ||
NYM | ELECTRICITY | NYISO ZONE G 5MW D AH PK | T3 | 06/2023 | 12/2027 | 400 USD | 18.000% | ||
NYM | ELECTRICITY | NEPOOL NEW HAMP 5MW D AH PK | U2 | 06/2022 | 06/2022 | 400 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NEW HAMP 5MW D AH PK | U2 | 07/2022 | 07/2022 | 1,000 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NEW HAMP 5MW D AH PK | U2 | 08/2022 | 12/2027 | 700 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NEW HAMP 5MW D AH O PK | U3 | 06/2022 | 06/2022 | 16 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL NEW HAMP 5MW D AH O PK | U3 | 07/2022 | 12/2027 | 40 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHD ISLD 5MW D AH PK | U4 | 06/2022 | 06/2022 | 400 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHD ISLD 5MW D AH PK | U4 | 07/2022 | 07/2022 | 1,100 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHD ISLD 5MW D AH PK | U4 | 08/2022 | 09/2022 | 700 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHD ISLD 5MW D AH PK | U4 | 10/2022 | 12/2027 | 250 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHODE IL 5MW D AH O PK | U5 | 06/2022 | 06/2022 | 16 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHODE IL 5MW D AH O PK | U5 | 07/2022 | 07/2022 | 40 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL RHODE IL 5MW D AH O PK | U5 | 08/2022 | 12/2027 | 25 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL INTR HUB 5MW D AH PK | U6 | 07/2022 | 07/2022 | 1,900 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL INTR HUB 5MW D AH PK | U6 | 08/2022 | 08/2022 | 1,800 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL INTR HUB 5MW D AH PK | U6 | 09/2022 | 11/2022 | 1,700 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL INTR HUB 5MW D AH PK | U6 | 12/2022 | 05/2023 | 600 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL INTR HUB 5MW D AH PK | U6 | 06/2023 | 12/2027 | 525 USD | 0.025 | ||
NYM | ELECTRICITY | PJM N ILLINOIS HUB RT PK CAL DAY5MW | UD | 06/17/2022 | 06/30/2022 | 4,000 USD | 0.05 | ||
NYM | ELECTRICITY | PJM N ILLINOIS HUB RT PK CAL DAY5MW | UD | 07/01/2022 | 07/11/2022 | 2,000 USD | 0.05 | ||
NYM | ELECTRICITY | PJM N ILLINOIS HUB RT PK CAL DAY5MW | UD | 07/12/2022 | 07/29/2022 | 1,600 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME O PK | V3 | 07/2022 | 07/2022 | 100 USD | 0.025 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME O PK | V3 | 08/2022 | 08/2022 | 95 USD | 0.025 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME O PK | V3 | 09/2022 | 10/2022 | 90 USD | 0.025 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME O PK | V3 | 11/2022 | 05/2023 | 70 USD | 0.025 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME O PK | V3 | 06/2023 | 12/2027 | 14 USD | 0.025 | ||
NYM | ELECTRICITY | PJM AEP-DAYTON HUB RT PK CALDAY 5MW | VD | 06/17/2022 | 06/30/2022 | 6,000 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AEP-DAYTON HUB RT PK CALDAY 5MW | VD | 07/01/2022 | 07/12/2022 | 4,500 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AEP-DAYTON HUB RT PK CALDAY 5MW | VD | 07/13/2022 | 07/29/2022 | 2,500 USD | 0.05 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD PEAK DAILY FIX | VDP | 06/16/2022 | 06/29/2022 | 1,500 USD | 0.08 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD PEAK DAILY FIX | VDP | 06/30/2022 | 07/06/2022 | 1,000 USD | 0.08 | ||
NYM | ELECTRICITY | PALO VERDE DAY AHEAD PEAK DAILY FIX | VDP | 07/07/2022 | 07/30/2022 | 750 USD | 0.08 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH O EAK | W2 | 06/2022 | 06/2022 | 16 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH O EAK | W2 | 07/2022 | 07/2022 | 45 USD | 0.025 | ||
NYM | ELECTRICITY | NEPOOL MAINE 5MW D AH O EAK | W2 | 08/2022 | 12/2027 | 30 USD | 0.025 | ||
NYM | ELECTRICITY | PJM APS ZONE DA OFF-PEAK | W4 | 06/2022 | 06/2022 | 11 USD | 0.05 | ||
NYM | ELECTRICITY | PJM APS ZONE DA OFF-PEAK | W4 | 07/2022 | 07/2022 | 25 USD | 0.05 | ||
NYM | ELECTRICITY | PJM APS ZONE DA OFF-PEAK | W4 | 08/2022 | 04/2023 | 10 USD | 0.05 | ||
NYM | ELECTRICITY | PJM APS ZONE DA OFF-PEAK | W4 | 05/2023 | 05/2028 | 7 USD | 0.05 | ||
NYM | ELECTRICITY | PJM PSEG DA OFF-PEAK | W6 | 06/2022 | 06/2022 | 10 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PSEG DA OFF-PEAK | W6 | 07/2022 | 07/2022 | 20 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PSEG DA OFF-PEAK | W6 | 08/2022 | 09/2022 | 15 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PSEG DA OFF-PEAK | W6 | 10/2022 | 04/2023 | 9 USD | 0.025 | ||
NYM | ELECTRICITY | PJM PSEG DA OFF-PEAK | W6 | 05/2023 | 05/2028 | 7 USD | 0.025 | ||
NYM | ELECTRICITY | PJM WESTERN HUB RT OP DAILY | WOR | 06/13/2022 | 06/30/2022 | 400 USD | 0.2 | ||
NYM | ELECTRICITY | PJM WESTERN HUB RT OP DAILY | WOR | 07/01/2022 | 07/31/2022 | 120 USD | 0.2 | ||
NYM | ELECTRICITY | PJM AECO DA OFF-PEAK | X1 | 06/2022 | 05/2028 | 10 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AECO DA OFF-PEAK | X1 | 07/2022 | 09/2022 | 25 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AECO DA PEAK | Y1 | 06/2022 | 05/2028 | 200 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AECO DA PEAK | Y1 | 07/2022 | 07/2022 | 450 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME PK | Z9 | 07/2022 | 07/2022 | 2,750 USD | 0.15 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME PK | Z9 | 08/2022 | 08/2022 | 2,700 USD | 0.1 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME PK | Z9 | 09/2022 | 10/2022 | 2,200 USD | 0.08 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME PK | Z9 | 11/2022 | 05/2023 | 1,300 USD | 0.05 | ||
NYM | ELECTRICITY | PJM AD HUB 5MW REAL TIME PK | Z9 | 06/2023 | 12/2027 | 300 USD | 0.05 | ||
NYM | ELECTRICITY | NYISO ZONE A DA OP DAILY | ZAO | 06/14/2022 | 07/01/2022 | 200 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE A DA OP DAILY | ZAO | 07/02/2022 | 07/31/2022 | 60 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE G DA OP DAILY | ZGO | 06/14/2022 | 07/01/2022 | 400 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE G DA OP DAILY | ZGO | 07/02/2022 | 07/31/2022 | 60 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE J DA OP DAILY | ZJO | 06/14/2022 | 07/01/2022 | 230 USD | 0.2 | ||
NYM | ELECTRICITY | NYISO ZONE J DA OP DAILY | ZJO | 07/02/2022 | 07/31/2022 | 60 USD | 0.2 | ||
NYM | ENVIRONMENTAL | IN DELIVERY MONTH EUA FUTURES | 6T | 06/2022 | 09/2022 | 2,300 EUR | 35.000% | ||
NYM | ENVIRONMENTAL | IN DELIVERY MONTH EUA FUTURES | 6T | 12/2022 | 12/2025 | 2,300 EUR | 15.000% | ||
NYM | ENVIRONMENTAL | CBL CCA VINTAGE 2021 FUT | CC1 | 06/2022 | 07/2022 | 1,050 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CBL CCA VINTAGE 2021 FUT | CC1 | 08/2022 | 12/2023 | 1,050 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CBL CCA VINTAGE 2022 FUT | CC2 | 06/2022 | 07/2022 | 1,050 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CBL CCA VINTAGE 2022 FUT | CC2 | 08/2022 | 12/2024 | 1,050 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CBL CCA VINTAGE 2023 FUT | CC3 | 06/2022 | 07/2022 | 1,050 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CBL CCA VINTAGE 2023 FUT | CC3 | 08/2022 | 12/2025 | 1,050 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CBL CRE GLBL EMI OFST (C-GEO) FUT | CGO | 07/2022 | 07/2022 | 1,000 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CBL CRE GLBL EMI OFST (C-GEO) FUT | CGO | 08/2022 | 12/2025 | 1,000 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CBL GLOBAL EMISSIONS OFFSET FUTURES | GEO | 06/2022 | 07/2022 | 1,300 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CBL GLOBAL EMISSIONS OFFSET FUTURES | GEO | 08/2022 | 12/2025 | 1,300 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CALIFORNIA LOW CARBON FUEL STANDARD | LCF | 06/2022 | 06/2022 | 1,250 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CALIFORNIA LOW CARBON FUEL STANDARD | LCF | 07/2022 | 05/2024 | 1,250 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CBL NATURE-BASED GLOBAL EMISSIONS O | NGO | 06/2022 | 07/2022 | 2,400 USD | 35.000% | ||
NYM | ENVIRONMENTAL | CBL NATURE-BASED GLOBAL EMISSIONS O | NGO | 08/2022 | 12/2025 | 2,400 USD | 15.000% | ||
NYM | ENVIRONMENTAL | CARBON RGGI EMISSION | RJ | 06/2022 | 12/2025 | 300 USD | 35.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 1 MTH SYN CAL SPD | 1CE | 06/2022 | 06/2022 | 12,462 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 1 MTH SYN CAL SPD | 1CE | 07/2022 | 07/2022 | 2,650 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 1 MTH SYN CAL SPD | 1CE | 08/2022 | 04/2025 | 2,400 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 1 MTH SYN CAL SPD | 1CE | 12/2022 | 12/2022 | 3,250 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 2 MTH SYN CAL SPD | 2CE | 06/2022 | 06/2022 | 12,087 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 2 MTH SYN CAL SPD | 2CE | 07/2022 | 07/2022 | 4,750 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 2 MTH SYN CAL SPD | 2CE | 08/2022 | 10/2022 | 2,500 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 2 MTH SYN CAL SPD | 2CE | 11/2022 | 12/2022 | 3,650 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 2 MTH SYN CAL SPD | 2CE | 01/2023 | 04/2023 | 2,800 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 3 MTH SYN CAL SPD | 3CE | 06/2022 | 06/2022 | 12,087 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 3 MTH SYN CAL SPD | 3CE | 07/2022 | 07/2022 | 4,750 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 3 MTH SYN CAL SPD | 3CE | 08/2022 | 09/2022 | 2,500 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 3 MTH SYN CAL SPD | 3CE | 10/2022 | 12/2022 | 3,650 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 3 MTH SYN CAL SPD | 3CE | 01/2023 | 03/2023 | 2,800 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 6 MTH SYN CAL SPD | 6CE | 06/2022 | 06/2022 | 12,087 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 6 MTH SYN CAL SPD | 6CE | 07/2022 | 07/2022 | 6,100 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 6 MTH SYN CAL SPD | 6CE | 08/2022 | 12/2022 | 3,650 USD | 15.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL 6 MTH SYN CAL SPD | 6CE | 01/2023 | 01/2023 | 2,800 USD | 15.000% | ||
NYM | ETHANOL | METHNL CFR CHINA SPECIFIC(ICIS) FUT | CMS | 06/2022 | 07/2022 | 4,000 USD | 25.000% | ||
NYM | ETHANOL | METHNL CFR CHINA SPECIFIC(ICIS) FUT | CMS | 08/2022 | 08/2022 | 3,700 USD | 25.000% | ||
NYM | ETHANOL | METHNL CFR CHINA SPECIFIC(ICIS) FUT | CMS | 09/2022 | 12/2023 | 3,600 USD | 25.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL FUT | CU | 06/2022 | 06/2022 | 1,913 USD | 40.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL FUT | CU | 07/2022 | 07/2022 | 7,750 USD | 30.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL FUT | CU | 08/2022 | 12/2022 | 7,500 USD | 25.000% | ||
NYM | ETHANOL | CHICAGO ETHANOL FUT | CU | 01/2023 | 05/2025 | 6,650 USD | 25.000% | ||
NYM | ETHANOL | NEW YORK ETHANOL FUT | EZ | 06/2022 | 06/2022 | 8,800 USD | 40.000% | ||
NYM | ETHANOL | NEW YORK ETHANOL FUT | EZ | 07/2022 | 07/2022 | 8,200 USD | 35.000% | ||
NYM | ETHANOL | NEW YORK ETHANOL FUT | EZ | 08/2022 | 05/2025 | 7,200 USD | 30.000% | ||
NYM | ETHANOL | METHANOL T2 FOB RDAM (ICIS) FUTURES | MT2 | 06/2022 | 07/2022 | 4,200 EUR | 25.000% | ||
NYM | ETHANOL | METHANOL T2 FOB RDAM (ICIS) FUTURES | MT2 | 08/2022 | 12/2023 | 4,000 EUR | 25.000% | ||
NYM | ETHANOL | METHANOL FOBHOUSTON (ARGUS) | MTH | 06/2022 | 07/2022 | 4,800 USD | 25.000% | ||
NYM | ETHANOL | METHANOL FOBHOUSTON (ARGUS) | MTH | 08/2022 | 12/2023 | 4,600 USD | 25.000% | ||
NYM | ETHANOL | UCO T1 CIF ARA EXCLNG DTY (PRI) FUT | UCE | 06/2022 | 05/2023 | 7,000 USD | 25.000% | ||
NYM | ETHANOL | UCOME BIODIESEL (RED CMPLT) FOB FUT | UCR | 06/2022 | 11/2023 | 13,000 USD | 25.000% | ||
NYM | ETHANOL | UCOME BIO FO (REDCT)(AR) VS LSG FUT | UCS | 06/2022 | 11/2023 | 7,000 USD | 25.000% | ||
NYM | ETHANOL | UCO T1 CIF ARA EXL DTY VS LSG FUT | USG | 06/2022 | 05/2023 | 6,000 USD | 25.000% | ||
NYM | ETHANOL | ETHANOL(PL) T2 FOB RTRDM INCL | Z1 | 06/2022 | 06/2022 | 2,400 EUR | 0.025 | ||
NYM | ETHANOL | ETHANOL(PL) T2 FOB RTRDM INCL | Z1 | 07/2022 | 05/2025 | 8,500 EUR | 0.025 | ||
NYM | ETHANOL | ETHANOL T2 INCL DUTY BALMO | Z1B | 06/01/2022 | 06/30/2022 | 1,287 EUR | 0.025 | ||
NYM | ETHANOL | ETHANOL T2 INCL DUTY BALMO | Z1B | 07/01/2022 | 08/31/2022 | 2,000 EUR | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TD22 (BALTIC) FUTURE | ACB | 06/2022 | 06/2022 | 4,500 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TD22 (BALTIC) FUTURE | ACB | 07/2022 | 02/2023 | 4,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TD22 (BALTIC) FUTURE | ACB | 03/2023 | 12/2027 | 2,700 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TD25 (BALTIC) FUTURE | AEB | 06/2022 | 06/2022 | 4,500 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TD25 (BALTIC) FUTURE | AEB | 07/2022 | 02/2023 | 4,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TD25 (BALTIC) FUTURE | AEB | 03/2023 | 12/2027 | 2,700 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG1G (LNG FUEL) | BL1 | 06/2022 | 07/2022 | 25,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG1G (LNG FUEL) | BL1 | 08/2022 | 08/2022 | 17,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG1G (LNG FUEL) | BL1 | 09/2022 | 12/2022 | 14,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG1G (LNG FUEL) | BL1 | 01/2023 | 12/2023 | 13,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG2G (LNG FUEL) | BL2 | 06/2022 | 07/2022 | 40,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG2G (LNG FUEL) | BL2 | 08/2022 | 08/2022 | 15,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG2G (LNG FUEL) | BL2 | 09/2022 | 12/2023 | 13,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG3G (LNG FUEL) | BL3 | 06/2022 | 07/2022 | 25,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG3G (LNG FUEL) | BL3 | 08/2022 | 08/2022 | 17,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG3G (LNG FUEL) | BL3 | 09/2022 | 12/2022 | 14,000 USD | 25.000% | ||
NYM | FREIGHT | LNG FREIGHT ROUTE BLNG3G (LNG FUEL) | BL3 | 01/2023 | 12/2023 | 13,000 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX01)BALTIC FUT | CS1 | 06/2022 | 06/2022 | 3,350 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX01)BALTIC FUT | CS1 | 07/2022 | 07/2022 | 2,950 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX01)BALTIC FUT | CS1 | 08/2022 | 12/2024 | 2,000 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX02)BALTIC FUT | CS2 | 06/2022 | 06/2022 | 130 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX02)BALTIC FUT | CS2 | 07/2022 | 08/2022 | 110 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX02)BALTIC FUT | CS2 | 09/2022 | 12/2024 | 90 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX03)BALTIC FUT | CS3 | 06/2022 | 06/2022 | 2,400 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX03)BALTIC FUT | CS3 | 07/2022 | 08/2022 | 2,250 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT (FBX03)BALTIC FUT | CS3 | 09/2022 | 12/2024 | 1,650 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX11)BALTIC FUT | CS4 | 06/2022 | 06/2022 | 810 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX11)BALTIC FUT | CS4 | 07/2022 | 08/2022 | 760 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX11)BALTIC FUT | CS4 | 09/2022 | 12/2024 | 485 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX12)BALTIC FUT | CS5 | 06/2022 | 08/2022 | 70 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX12)BALTIC FUT | CS5 | 09/2022 | 12/2024 | 60 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX13)BALTIC FUT | CS6 | 06/2022 | 06/2022 | 620 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX13)BALTIC FUT | CS6 | 07/2022 | 08/2022 | 580 USD | 25.000% | ||
NYM | FREIGHT | CONTAINER FREIGHT(FBX13)BALTIC FUT | CS6 | 09/2022 | 03/2025 | 350 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUID GAS BALMO | FLB | 06/01/2022 | 06/30/2022 | 1,811 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUID GAS BALMO | FLB | 07/01/2022 | 08/31/2022 | 3,750 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUEFIED PETROLEUM G | FLJ | 06/2022 | 07/2022 | 11,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUEFIED PETROLEUM G | FLJ | 08/2022 | 11/2022 | 10,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUEFIED PETROLEUM G | FLJ | 12/2022 | 12/2023 | 9,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUID PETROLEUM GAS | FLP | 06/2022 | 10/2022 | 11,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE LIQUID PETROLEUM GAS | FLP | 11/2022 | 12/2024 | 8,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC14 (BALTIC) FUTURES | FRC | 06/2022 | 07/2022 | 7,500 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC14 (BALTIC) FUTURES | FRC | 08/2022 | 12/2027 | 5,500 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC12 (BALTIC) FUT | FRS | 06/2022 | 07/2022 | 8,000 USD | 8.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC12 (BALTIC) FUT | FRS | 08/2022 | 05/2024 | 6,000 USD | 8.000% | ||
NYM | FREIGHT | FREIGHT ROUTE SK TO SING TC11 BALMO | T1B | 06/01/2022 | 06/30/2022 | 1,255 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE SK TO SING TC11 BALMO | T1B | 07/01/2022 | 08/31/2022 | 2,600 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD20 BALTIC BALMO FUT | T2B | 06/01/2022 | 06/30/2022 | 603 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD20 BALTIC BALMO FUT | T2B | 07/01/2022 | 08/31/2022 | 1,250 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD20 (BALTIC) FUTURES | T2D | 06/2022 | 06/2022 | 3,100 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD20 (BALTIC) FUTURES | T2D | 07/2022 | 08/2022 | 3,100 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TD20 (BALTIC) FUTURES | T2D | 09/2022 | 12/2027 | 2,600 USD | 0.025 | ||
NYM | FREIGHT | MINI FREIGHT ROUTE TD20 (BALTIC) DA | T2M | 06/16/2022 | 09/29/2022 | 300 USD | 0.08 | ||
NYM | FREIGHT | FREIGHT ROUTE TD3C (PLATTS) BALMO F | T3B | 06/01/2022 | 06/30/2022 | 531 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD3C (PLATTS) BALMO F | T3B | 07/01/2022 | 08/31/2022 | 1,100 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC14 BALTIC BALMO FUT | T4B | 06/01/2022 | 06/30/2022 | 1,630 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC14 BALTIC BALMO FUT | T4B | 07/01/2022 | 08/31/2022 | 3,375 USD | 0.05 | ||
NYM | FREIGHT | MINI FREIGHT ROUTE TC14 (BALTIC) DA | T4D | 06/16/2022 | 09/29/2022 | 500 USD | 0.08 | ||
NYM | FREIGHT | FREIGHT ROUTE TC15 BALTIC BALMO FUT | T5B | 06/01/2022 | 06/30/2022 | 1,569 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC15 BALTIC BALMO FUT | T5B | 07/01/2022 | 08/31/2022 | 3,250 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC15 (BALTIC) FUTURES | T5C | 06/2022 | 06/2022 | 7,000 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC15 (BALTIC) FUTURES | T5C | 07/2022 | 07/2022 | 6,000 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TC15 (BALTIC) FUTURES | T5C | 08/2022 | 10/2022 | 5,000 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TC15 (BALTIC) FUTURES | T5C | 11/2022 | 12/2024 | 4,500 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TC6 BALTIC BALMO FUT | T6B | 06/01/2022 | 06/30/2022 | 543 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC6 BALTIC BALMO FUT | T6B | 07/01/2022 | 08/31/2022 | 1,125 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC17 (BALTIC) FUTURES | T7C | 06/2022 | 06/2022 | 6,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC17 (BALTIC) FUTURES | T7C | 07/2022 | 12/2027 | 5,500 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TD8 BALTIC BALMO FU | T8B | 06/01/2022 | 06/30/2022 | 483 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD8 BALTIC BALMO FU | T8B | 07/01/2022 | 08/31/2022 | 1,000 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC18 (BALTIC) FUTURES | T8C | 06/2022 | 07/2022 | 6,100 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC18 (BALTIC) FUTURES | T8C | 08/2022 | 11/2022 | 6,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC18 (BALTIC) FUTURES | T8C | 12/2022 | 06/2024 | 5,900 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC18 (BALTIC) FUTURES | T8C | 07/2024 | 12/2024 | 5,800 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC9 BALTIC BALMO FUT | T9B | 06/01/2022 | 06/30/2022 | 966 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC9 BALTIC BALMO FUT | T9B | 07/01/2022 | 08/31/2022 | 2,000 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC12 BALTIC BALMO FUT | TB2 | 06/01/2022 | 06/30/2022 | 1,207 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC12 BALTIC BALMO FUT | TB2 | 07/01/2022 | 08/31/2022 | 2,500 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE SK TO SINGA (TC11) | TC1 | 06/2022 | 12/2025 | 2,000 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC6 (BALTIC) FUT | TC6 | 06/2022 | 07/2022 | 4,000 USD | 0.08 | ||
NYM | FREIGHT | FREIGHT ROUTE TC6 (BALTIC) FUT | TC6 | 08/2022 | 05/2024 | 3,300 USD | 0.08 | ||
NYM | FREIGHT | FREIGHT ROUTE TC7 (BALTIC) FUTURES | TC7 | 06/2022 | 06/2022 | 4,700 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC7 (BALTIC) FUTURES | TC7 | 07/2022 | 12/2027 | 4,500 USD | 25.000% | ||
NYM | FREIGHT | FREIGHT ROUTE TC9 (BALTIC) FUTURES | TC9 | 06/2022 | 06/2022 | 4,000 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC9 (BALTIC) FUTURES | TC9 | 07/2022 | 07/2022 | 3,800 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TC9 (BALTIC) FUTURES | TC9 | 08/2022 | 10/2022 | 2,600 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TC9 (BALTIC) FUTURES | TC9 | 11/2022 | 05/2025 | 2,200 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TD3C (PLATTS) FUTURES | TD3 | 06/2022 | 12/2024 | 3,500 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD8 (BALTIC) FUTURES | TD8 | 06/2022 | 06/2022 | 4,000 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TD8 (BALTIC) FUTURES | TD8 | 07/2022 | 07/2022 | 3,000 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TD8 (BALTIC) FUTURES | TD8 | 08/2022 | 12/2024 | 2,000 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TD19 (BALTIC) FUTURES | TDM | 06/2022 | 12/2027 | 2,700 USD | 25.000% | ||
NYM | FREIGHT | TC5 RAS TANURA TO YOKOHAMA 55K MT | TH | 06/2022 | 06/2022 | 7,500 USD | 0.025 | ||
NYM | FREIGHT | TC5 RAS TANURA TO YOKOHAMA 55K MT | TH | 07/2022 | 08/2022 | 5,500 USD | 0.025 | ||
NYM | FREIGHT | TC5 RAS TANURA TO YOKOHAMA 55K MT | TH | 09/2022 | 12/2027 | 4,500 USD | 0.025 | ||
NYM | FREIGHT | FREIGHT ROUTE TC5 (PLATTS) BALMO FU | THB | 06/01/2022 | 06/30/2022 | 724 USD | 0.05 | ||
NYM | FREIGHT | FREIGHT ROUTE TC5 (PLATTS) BALMO FU | THB | 07/01/2022 | 08/31/2022 | 1,500 USD | 0.05 |
Margins, also known as Performance Bonds are deposits required to ensure that a clearing member can cover potential losses with his or her trading positions. Margins / Performance bonds help to ensure that clearing members can meet their obligations to their customers and to CME Clearing. Performance bonds/margins vary according to product and market volatility.
To stay up-to-date with performance bond requirements and compliance concerns with the changing regulatory environment.
Clearing Fees
+1 312 648 5470
efsadmin@cmegroup.com
Risk Management, PC-SPAN Hotline
+1 312 648 3888
Clearing.riskmanagement@cmegroup.com
CME Clearing Financial Unit
+1 312 207 2594
chfin@cmegroup.com
Clearing System Password Help
+1 312 930 3444
Deliveries
+1 312 930 3172
General Clearing Division
+1 312 930 3170